Skip to content

HKC Roofing is now Globe Iron Roofing — same trusted team, new name.

First Baptist Church of Dayton: Restoring a Landmark.
Back to All Projects
Category: Historic Restoration & Specialty Masonry

Category: Historic Restoration & Specialty Masonry

First Baptist Church of Dayton Restoring a Landmark

Technical Snapshot

We believe in precision and radical transparency. Here is the data behind the restoration.

  • Location: Dayton, OH
  • Primary Materials: 20-ounce Copper, Waterproofing Membrane
  • Project Duration: 6 Months (November – April)
  • Logistical Method: Full-height scaffolding, site staging, safety setup, and material storage coordination.

In the heart of Dayton, a historic steeple stood in need of more than just a repair—it required a total restoration. Spanning four seasons and braving the extremes of a Midwest winter, the Globe Iron crew executed a surgical restoration to bring this architectural icon back to its original glory.

Baptist Before
Restoring a Landmark
Baptist After
Restoring a Landmark

The "Four-Season" Restoration.

Logistical Muscle

Mobilizing a crew for high-elevation steeple work in sub-zero temperatures requires elite safety protocols and logistical discipline. We utilized specialized winter-grade rigging to ensure progress never stalled, even as the wind and ice attempted to shut down the site.

Surgical Carpentry Integration

Our technicians performed meticulous carpentry repairs to the structural framework, ensuring the new copper details and original wood substructure was watertight.

"Friday at 5" Transparency

Given the height and complexity of the steeple, the client couldn’t easily inspect the work. Our digital reporting provided the church board with high-resolution evidence of every solder joint and stone repair, ensuring total confidence in the investment.

A Legacy Protected.

Today, the steeple stands tall and proud—a permanent fixture of the Dayton skyline restored for the next century. By self-performing the specialty metalwork and the masonry, we eliminated the scope gaps that often plague landmark restorations, delivering a unified, “Zero Gap” solution.

Whatever the project demands.

Your building’s envelope deserves a master-builder’s perspective. Let’s discuss your next complex project.